Switching Tower

Materials Required

  • Perfic Panels: 1-Six-Pack (only 2 sheets actually required)

  • 3D Plastic Veneer Sheets as suggested below

  • Glue: 1 tube of Omni-Stick glue

  • Plastic Wood Filler: small tub, only if required

  • Paint and Brushes: as required.

Suggested Plastic Veneer sheets

  • Walls:  

    • 2 sheets of 6" Lap Siding

    • 1 packet of Corner Angles

  • Roofs:  1 sheet of Steel Rib Roof or Asphalt Shingles

  • Details:  1 detail sheet of Station windows and doors

Use the print button on your browser to print this page, to use as a reference for ordering.